Under Construction

Scope of project is to convert existing Welcome Center into a 16 apartment units with common corridor, lobby, and laundry room.

  • Mechanical, Electrical, Plumbing, Fire Sprinkler, Fire Alarm, Low Voltage are all to be delivered in a Design/Build delivery method.

  • Project area is currently classified as Group A-3, Group B and Group M. Proposed remodel would be classified as Group R-2.

  • Project was originally constructed under the 2006 IBC with MN amendments.

  • Construction Type 1A below the level 2 floor slab, and Type VA above the level 2 floor slab, and utilizes the special provision (509.2 in IBC 2006).

  • Building is fully sprinkled per NFPA 13.

  • Exiting loads will be reduced due to change in occupancy; all existing exits will remain.

PROJECT DETAILS:

Start Date: October 2025

Total Square Footage: 7,876

Total Units: 16

Construction Time Frame: 6 Months